PV power plant AERINO Energy

A challenging project with a natural gas pipeline crossing through the middle of the construction site.
griechenland_light.svg
Volos
Central Greece
solar_light.svg
5.5 MW
Capacity
gruene-energie_light.svg
8.4 GWh
Annual yield
lokal-standort_pachtflaeche_light.svg
11.7 Ha
Total land area

equivalent to >16 football fields

kohlenstoffdioxid_light.svg
5,700 tons
Co2 emissions avoided
solar_light.svg
22,896
Photovoltaic panels

The solar power plant in Aerino in the region of Volos in Central Greece was developed for the client AERINO Energy. The project provided a special challenge for JUWI due to the existence of a natural gas pipeline which crosses the middle of the field on which the solar power plant was built. However, this challenge was overcome and the plant was comissioned in February 2013.

 

Over 20,000 solar panels now generate 8.4 million kilowatt hours of clean electricity annually, succient to supply approximately 1,800 homes. The solar power plant also prevents the emission of 5,700 tons of CO2 per year.